山东鼎胜制冷设备有限公司
地址:济南天桥区粟山路泉利重配城
全国咨询热线:400-096-6610
电话:0531-85968762
手机:13075373251
联系人:邓老师
当前位置:首页-新闻资讯-行业动态
行业动态
医药冷库工程在设计安装中需要注意哪些问题
2015-9-21 9:31:24
医药冷库在设计安装过程中需要注意以下几点:
Medicine in the refrigerator design and installation process need to pay attention to the following:
1、医药冷库需要安装在建筑强度大,地面相对平稳,且通风良好,温度低,避光性强,雨水相对较少的地方。
1, the medicine need to install the refrigerator in building strength, relatively flat on the ground, and well ventilated, low temperature, avoid light, rain is relatively small.
2、组合式冷库工程安装需要一个水平的混凝土基座。基座出现基础倾斜,凹凸的时候,必须要将基座修复平整。
2, combined cold storage engineering installation requires a level of concrete base. Base base tilt, concave and convex, must will dock repair level off.
3、医药冷库冷库工程的安装要离开发热器具和设备。
3, pharmaceutical refrigerator cold storage engineering installation to leave heating appliances and equipment.
4、排水管上安装U型管,避免导致机组收到腐蚀。
4, install U tube drain, avoid corrosion causes received.
5、医药冷库工程在较热的地方,不但冷却效率会下降,有时还会损伤冷库保温板,另外,保证机组正常工作的周围温度的范围是在35度以内。还要留出对机组进行检修的空间。
5, medicine, cold storage project in a hot place, not only the cooling efficiency will decline, cold storage insulation board, sometimes damage on the other hand, guarantee the normal work of the unit of the ambient temperature range is within 35 degrees. It is the space set aside for unit overhaul.
6、 拼接冷库保温板时注意在库板的凸边上完整的粘贴海绵胶带,安装冷库板时不要碰撞海绵交待粘贴位置。
6, joining together refrigerator insulation board in the plate when you complete paste on the convex side of the sponge tape, installing a refrigerator plate paste position not impact the sponge.
7、冷库内的拍水用排水管排出,会经常有水排出,所以要将排水导向能够顺畅流通的地方。
7, take water in the refrigerator with a drain discharge, often can have water, so to guide the drainage can flows smoothly.
8、排水管上一定要安装U型管,安设U型管可防止冷气泄露,昆虫、老鼠的入侵。
8, a drain on must install u-shaped tube, make U tube can prevent the air leak, the invasion of insects, mice.
9、医药冷库库体安装好后,检查各板缝贴合情况,必要时内外均应填硅胶封闭。
9, medicine after installation of cold storage library body, check the plate seam joint, shall fill in the silica gel inside and outside the closed when necessary.
10、由于冷库的库板种类繁多,安装活动冷库是应参照“冷库拼装示意图”。
10, because there are many different kinds of cold storage library board, cold storage installation activities is should consult "refrigerator assembly plan".
11、拧紧挂钩时,应缓慢均匀用力,拧至板缝合拢,不可用力过度,以免钩盒拔脱。
Firstly, 11, tighten the hook should slow, twist to the plate suture approach, not overexert, lest josephalbert hook box.
12、组合式冷库隔墙板应用隔墙角钢固定。
12, combined-type clapboard refrigerator application partition fixed Angle.
13、管路及电器安装完成后,组合式冷库库板上所有的管路穿孔,必须用防水硅胶密封。
13, piping and electrical installation is completed, combined cold storage library board all pipe perforation, must use waterproof silicone seal.
14、冷库冷藏设备安装结束后,有时在凝土基地干透前会出现结露。在梅雨季节等湿度异常高的时候,库板的接缝会出现结露,很小的情况下,整修库板也会出现结露,这些都是暂时的现象,必要的时候要进行擦拭。
14, the end of the cold storage refrigeration equipment installation, and sometimes will appear in front of the concrete base dry condensation. In plum rains season when unusually high humidity, condensation, library board seam will appear under the condition of small, renovated library board also can appear condensation, these are temporary phenomenon, when it's necessary to wipe.

在线咨询