冷风机的厚度和面积直接决定其造价标准
2017-12-13 18:16:45

一、冷库整体拼装时应与墙体及屋顶留有间隙,冷库地板安装平整,不平处用材料把地坪垫平,并锁紧板与板之间锁钩,用硅胶密封,达到库面平整,无空心感,冷库库体的顶板、地板、立板安装好后,顶与立、立与地板之间修正平齐并锁紧,彼此间所有锁钩。

A cold, the whole assembly should be with the walls and roof gaps, cold floor installation flat, the uneven floor pad material, and the locking plate and the lock hook plate, seal with silicone, reach the base surface is smooth, no hollow, roof, floor and the vertical plate installed after the cold storage between the top and the vertical, vertical, and modified floor flush and locked each other all lock hook.

1、选择吊点位置时,首先考虑空气循环 的位置,其次在考虑库体结构方向。

1. When selecting the position of the lifting point, the position of the air circulation is considered first and the direction of the structure of the reservoir is considered.

2、冷风机与库板间隙要大于冷风机的厚度。

2, the gap between the cooling fan and the plate is greater than the thickness of the air cooler.

3、冷风机所有吊栓应全部紧固,并用密封胶将螺栓及吊栓穿孔封闭,防止冷桥和漏气。

3. All the hoisting bolts of the air cooler should be all fastened, and the bolts and hoisting bolts are sealed with sealant to prevent the cold bridge and air leakage.

4、吊顶风机过重时,应用4号角或5号角铁做过梁,过梁应横跨到另一块顶板和墙板上,以减轻承重。

4, the ceiling fan is overweight, 4 horn or No. 5 angle lintel lintel should do, across to another piece of roof and wall panels, to reduce the load.

二、制冷机组的组装安装技术:

Two. The assembly and installation technology of the refrigerating unit:

1、半封或全封闭压缩机都应安装油分离器,并在油分内加住适量机油,蒸发温度低于—15度时,应加装气液分离器并加装适量冷冻机油。

1, semi closed or full closed compressor oil separator should be installed, and the amount of oil in the oil business and live, evaporation temperature is below - 15 degrees, should install the gas-liquid separator and add the amount of refrigerant oil.

2、压缩机底座应安装减震胶座。

2, the base of the compressor should be fitted with a damping rubber seat.

3、机组的安装要留有维修空间,便于观察仪表和阀门的调节。

山东冷库造价

3, the installation of the unit should have room for maintenance, so that it is convenient to observe the adjustment of the instrument and valve.

4、高压表应安装在储液灌阀门三通处。

4. The high pressure meter should be installed at the three place of the liquid storage valve.

5、机组整体布局合理,颜色一致。各型号机组安装结构应保持一致。

5. The whole layout of the unit is reasonable and the color is consistent. The installation structure of each type of unit should be consistent.

本文的精彩内容来自山东冷库造价详细内容请点击我们的官方网站:http://www.sddslk.com谢谢您的到来!

The wonderful content of this article comes from the detailed content of the cost of Shandong cold storage. Please click on our official website: http://www.sddslk.com thank you for your arrival.